The Merafeng Project | The Khani Foundation
SCHOOLS ACTIVE 03
GDE PARTNERSHIP VERIFIED
PROGRAM SPEND 70%
DATA UPDATED QUARTERLY
Founding campaign · Merafeng Primary School

This is our starting point. Here’s what your gift changes.

Merafeng is the first school in our Foundation Phase program — and this is a full renovation, not a patch job: roofing, structural walls, sanitation, and grounds, all at once. Before we describe what we’re building, we want you to see exactly what exists today. No campaign has been funded here yet. You would be among the first.

Merafeng Primary School — classroom, sports field, and playground
$0
raised so far
$275,000
renovation goal
0
founding donors
Classrooms & learning spaces

Where children are learning to read right now.

Exposed ceiling beams above classroom shelves
Exposed ceiling beams above shelves of learning materials
Structural crack above filing cabinet in classroom corner
Structural crack, classroom corner
Peeling wall paint near electrical outlet
Wall paint failure near electrical outlet, chalkboard wall
Peeling classroom wall paint
Peeling wall paint, classroom corner
Severe wall cracking below chalkboard
Wall paint failure below the chalkboard
Severely cracked wall at covered classroom entrance
Severe cracking throughout walls
Exterior wall beneath classroom windows
Interior walls of classrooms
Sanitation & water

Basic facilities, under real strain.

Boys bathroom exterior door
Boys’ bathroom, exterior entrance
Portable toilet units beside the playground
Portable toilet units beside the playground
Water tanks and portable toilets, rear grounds
Water tanks and portable toilets, rear grounds
Building exterior & structure

Decades of wear on the walls that hold the school together.

Long school building exterior with dry field
Main classroom block, front field
Wall corner erosion at ground level
Wall corner erosion at ground level
Perimeter wall and gate with cracked plaster
Perimeter wall and gate, cracked plaster
Passage between classroom blocks
Passage between classroom blocks
Drainage slab and debris behind classrooms
Drainage slab and debris, behind classrooms
Perimeter fencing and open field, rear of school
Outside view of classrooms
Covered walkway between classroom blocks
Covered walkway between classroom blocks
Covered walkway with barred window and downpipe
Covered walkway, barred window and downpipe
Playground & Sports Grounds

Where play should happen, but rarely can.

Gravel sports court
Sports court, worn gravel surface
Sports court with distant backboard
Netball court, uneven surface
Damaged backboard on sports court
Damaged backboard, sports court
Broken seesaw and climbing frame in overgrown grass
Broken seesaw and climbing frame, overgrown
Fenced play area with jungle gyms and slides
Fenced play area, jungle gyms and slides
Jungle gym with broken ladder and slide
Jungle gym, broken ladder and slide
Playground equipment with classroom block behind
Playground equipment, classroom block behind
Collapsed monkey bars and seesaw ramp
Collapsed monkey bars and seesaw ramp
For companies & institutional partners

A $275,000 undertaking is built for shared funding.

A renovation this size rarely closes on individual gifts alone. We’re actively structuring matched-giving and corporate co-funding for Merafeng — a partner commits a lead gift or a match, and we use it to unlock giving from our wider donor circle. If your company wants its gift doubled in impact, or wants naming/reporting tied to a specific phase of the rebuild (roofing, sanitation, grounds), talk to us before you give.

Matched gifts
Commit a match and we’ll pair it with individual donor gifts as they come in, rand for rand, up to your ceiling.
Phase sponsorship
Fund one phase of the rebuild outright — roofing, walls, sanitation, or grounds — with reporting specific to that scope.
Multi-year pledges
Spread a commitment across the renovation timeline instead of a single gift.
Talk to us about partnering on Merafeng → Give directly to Merafeng →
Questions donors ask

Before you give.

Why $275,000?
This covers a full renovation, not a single repair: roof and ceiling work, structural wall and plaster repair across multiple blocks, permanent sanitation to replace the portable toilets, and rebuilding the playground and sports grounds. It’s a large number because it’s the real, all-in cost — we chose not to break it into smaller asks that understate the scope.
Nothing has been raised yet — why start now?
Merafeng is the first school in our Foundation Phase program. We publish this page at $0 raised, honestly, because we’d rather show you the real starting line than inflate early momentum.
How will funds be used and tracked?
Consistent with our 70/30 principle sitewide, at least 70 cents of every rand goes directly to the renovation work itself. We report progress to funders as work is contracted and completed — you’ll see updates, not just a thank-you email.
Can I give toward a specific part of the renovation?
Yes — this campaign is tracked as one goal rather than split into separate line items, but if you or your company want a gift directed at a specific phase (sanitation, roofing, playground), reach out and we’ll confirm it in writing.
Be a founding donor

Join a very special group of people who are blazing the trail towards this incredible work of rebuilding Merafeng Primary School.

Every dollar toward Merafeng starts at zero today. Founding donors set this campaign in motion — $275,000 rebuilds the classrooms, sanitation, walls, and play spaces documented above.

Donate to the Merafeng campaign →

Get email updates from The Circle

Quarterly impact drops, campaign milestones, no spam.

Mailing list
© 2026 The Khani Foundation · 501(c)(3) nonprofit · EIN 42-4157220
Governance & Transparency · Form 990 (on file) · Contact